UAE Equipment Rental Projects

    A selection of recent and ongoing equipment rental campaigns across Abu Dhabi, Dubai, Sharjah, JAFZA and the Western Region. Each project below is a real engagement — equipment classes, durations and locations are accurate; client names are withheld where confidentiality applies.

    ADNOC Habshan Facility — CICPA Crane Support

    Habshan, Abu Dhabi8 months (2025)

    Equipment: 100T & 200T mobile cranes, CICPA site-access operators

    Sustained crane support for a turnaround maintenance window on an ADNOC sour-gas processing facility. Pre-cleared CICPA gate passes, 24-hour operator rotations and a dedicated transport coordinator kept the lift schedule on-plan across a 240-day campaign.

    ICAD II Logistics Warehouse Build

    ICAD II, Abu Dhabi14 months (2024–2025)

    Equipment: Telehandlers, 50T mobile cranes, scissor lifts, generators

    End-to-end equipment package for a 38,000 m² distribution warehouse. Multi-machine site supply with weekly site visits from our service team and four-hour breakdown swap-out commitments.

    JAFZA Cold-Store Modular Erection

    JAFZA, Jebel Ali5 months (2025)

    Equipment: 250T all-terrain crane, 21m rotating telehandlers, boom lifts

    Precast panel erection and refrigeration plant placement on a JAFZA-bonded cold-store facility. TRAKHEES permits and gate-pass logistics managed in advance to keep the lift programme uninterrupted.

    Sheikh Mohammed Bin Zayed Road Utility Trenching

    Dubai3 months (2025)

    Equipment: 14T short-tail excavators, mini-excavators, low-bed transport

    DEWA-corridor trenching with RTA-approved plant movement and night-shift operations to minimise lane closures on a critical SMBZ Road corridor.

    Mussafah Fabrication Yard Module Lifts

    Mussafah, Abu DhabiRecurring (2024–2026)

    Equipment: 50T–200T mobile cranes, transport trailers

    Monthly module-lift programme for a Mussafah fabrication yard supplying offshore packages. Same operators every visit for site-familiarity and lift-plan continuity.

    Sharjah Industrial Area — Factory Façade Refurbishment

    SIA 13, Sharjah4 months (2025)

    Equipment: 28m articulating boom lifts, 14m electric scissor lifts

    Multi-unit access package for a factory cladding and signage replacement programme. IPAF-carded operators and MEWP rescue plans supplied to satisfy the client's EHS audit.